A good construction method
can help to save refractories,
but many many people don’t know how to do it exactly, here are the construction
methods of castable for ladle bottom and ladle wall.
Casting
of Backing Layer for Ladle Bottom (construction time: 1 day)
Firstly, fix
Refractory Permeable
Brick and Well Block, and then plug the inner hole with some resilient staff.
Secondly, weld some anchoring nails in the
middle area of ladle bottom between one well block and another, the vertical
and horizontal distances between every two anchoring nails are 25 mm and 30 mm .
Thirdly, mix backing layer castable for
ladle with about 5% of water, and then stir it for about 20 minutes till
smooth.
At last, pave the mixed backing layer refractory castable at the bottom of ladle, and then
vibrate it to 100mm
in thickness by flat vibrator.
Casting
of Backing Layer for Refractory Ladle
Wall (construction time: 1 day)
After maintenance of bottom permanent
layer, stick a layer of high alumina fiber mat which is 10 mm in thickness with the ladle shell. Then
place the mould right in the middle, flat, no deviation. The mould surface
should be clean, smooth and greased for easy demould.
Lay
the mould properly to ensure that the gaps between mould and sidewall are the
same, then pour the mixed backing layer refractory castable into the gaps,
vibrate it by vibration bar till no bubble emerges (If mould is unavailable,
cast working layer first and then permanent backing layer). The bottom of
permanent backing layer is 100 mm
in height; vibrate 300-400 mm
per time, and its 90-100 mm
in thickness, then one circle by one circle till to the top.
After
vibration of permanent backing layer, lift the refractory ladle to an area at
higher temperature, so that it is convenient for water evaporation and drying
of cast body. The time of demould should be more than 12 hours, usually 24
hours, specific time depends on lining harden situation.